Bathroom Renovation in Mauritius

A bathroom renovation only looks as good as the work underneath it. Maurenov handles every bathroom renovation from the waterproofing and plumbing rerouting up, so the finished room stays dry, functional and good-looking for years, not just until the next rainy season.

We visit your site first, then provide a clear, itemised quote before any demolition or work begins.

Finished bathroom with tiled walls and bathtub, renovated by Maurenov in Mauritius
What's Included

Bathroom Renovation: What's Included

  • Waterproofing (membrane and tanking)
  • Floor and wall tiling
  • Modern fittings: basins, showers, toilets
  • Plumbing rerouting where needed
  • Ventilation and extraction
  • Demolition and removal of old fixtures
Good to Know

Bathroom Renovation: What to Expect

Scope usually starts with stripping out the old fittings, tiling and, where needed, exposing and rerouting pipework, followed by waterproofing, floor and wall tiling, fitting the new basin, shower and toilet, and checking ventilation and extraction work correctly before everything is sealed up. Fittings are chosen to suit the room's plumbing layout and your preferred style. A bathroom renovation generally takes a few weeks from demolition to finished fittings, with waterproofing cure time and tiling adding the most to the schedule — a straightforward fittings swap without re-tiling is faster.

One bathroom project in our gallery shows the floor stripped back to exposed pipework with the shower mixer relocated, followed by the finished room — a fully tiled bathroom with a tiled bathtub surround, the waterproofing and tiling work complete before any fittings went back in.

Common Questions

Frequently Asked Questions

Is waterproofing included in a bathroom renovation?

Yes. Proper waterproofing is part of any bathroom renovation we do — it's not an optional extra, since tiling over an unwaterproofed floor or wall causes problems later.

How long does a bathroom renovation take?

A typical bathroom renovation takes a few weeks depending on scope — demolition, waterproofing curing time, tiling and fitting installation all add up. We'll give you a timeline with your quote.

Can you match my existing tiles or fittings?

We can source tiling and fittings to match your preferred style, or help you choose new ones during the quote visit.

Do you handle the plumbing changes needed to move a toilet or shower?

Yes, rerouting plumbing for a new layout is part of our bathroom renovation service.

Get In Touch

Ready to Get Started?

Call, WhatsApp or email us to get a free, no-obligation quote for your project.